Full Electrical Services & re-wire installation of an existing hospital.
The electrical services installation included:
A new Access Control Installation was provided on the second & third floors of the hospital as a security measure for the patients & staff. A new main distribution board was installed incorporating an automatic genie changeover. A new Antibacterial Bed Head Dado Trunking installation was provided in the 60 No Bedrooms, which incorporated a bed head PL light fitting. As part of our Installation we installed a Full Energy Saving Lighting System including Motion Detectors in all W.C. & store areas.
As this project was carried out while the existing hospital was operational, particular attention was paid to dust, noise, & general building practices and continuous liaison with the client to ensure minimum disruption to the patients & hospital staff.
Client:
Mount Alvernia Hospital, Mallow
Engineer:
Varmings, Cork
Main Contractors:
Spillane Brothers Construction