Project Category
Category :
Healthcare, Live Projects
Project Overview
This project consists of the strip out of the Second-Floor level and the construction of two new operating theatre suites, theatre recovery and ancillary areas
More Details
A new electrical plantroom will be constructed externally at Second Floor level. The electrical services works will also include all necessary decommissioning, isolation, and diversions of existing services to facilitate strip out works. The electrical services installations include:
- Decommissioning Isolation
- Disconnection, and removal of existing services.
- New 400V/ 3 Ph. mains power connection to the existing main distribution board.
- Cable Containment
- LV Power Installation
- General Lighting and Controls
- Emergency Lighting
- Automatic Fire Detection and Alarm
- ICT Installation
- Medical Lighting and Medical Power Supplies
- Access Controls
- CCTV
- Motive Power and Controls wiring
- UPS and Static Inverter installations
- Isolated Power Services Installations
- Nurse Call Installations
- Earthing and Bonding
- Testing and Commissioning